Alcuni contenuti potrebbero non essere disponibili nella lingua selezionata
30 km from Lille and 16 km from Lens, in the heart of the Pas de Calais mining basin, a courier building under development with a surface area of 10,350 m².
Developed within the Delta 3 logistics site, this building will benefit from :
- a motorway interchange dedicated to the site via the A1/E17 ; - a connection to the Haute Deûle canal providing the Dunkirk/Valencienne link; - 2 rail connections (the main one on the Lens-Ostricourt track)
The site also hosts services dedicated to HGVs: secure parking, maintenance workshop, service stations in particular, but also a training centre, restaurants, etc.
Features
2 transit halls 2,301 m² unloading iron wharf (383.5 m x 6 m) Height : 5.5 m Ground level access : 1 Dockside access : 37 Floor load : 5 t/m² Heavy traffic