OUDALLE (76), construction of 2 logistics platforms located in the heart of the Port of Le Havre, at the foot of the Pont de Normandie, directly linked to the new multimodal platform.
Launch in white. Delivery scheduled for April 2023.
Surfaces
| Module | Area | Type | Rent (€ HT/an) | Price (€) |
|---|
| Cells B1 to B6C | 12,304 m² | logistics warehouse | 689,024 | 0 |
| Cells B1 to B6C | 12,352 m² | logistics warehouse | 691,712 | 0 |
| Cells B1 to B6C | 6,083 m² | logistics warehouse | 340,648 | 0 |
Features
11 platform doors/cell
1 level access/ 2 cells, height 4.35 m
Post grid: 25 x 12
4 load rooms
Targeted certification Breeam Very Good
Height : 11.4 m
Dockside access : 12
Floor load : 5 t/m²
Sprinkler
Hose station
Heavy traffic
IT :
Fiber optic connected, Skirting boards
Layout :
Fully partitioned
Technical :
False ceilings
2 office blocks