Property details
Energy class
Pending release
EOL is marketing a new SME/SMI park for rent, with delivery scheduled for the end of 2020 for phase 1 and the beginning of 2021 for phase 2.
This latest generation business park will be built in BRIE COMTE ROBERT (77), in the immediate vicinity of the Ile-de-France motorway (N104) in an eco-responsible environment.
Phase 1 consists of a building of approximately 3,445 m² that can be adapted and divided into units of 1,714 m² or more.
With services adapted to current needs, height under beam of 8 metres, floor load of 3 tonnes/m², 2 ground level accesses and one platform access per cell... this building can meet your needs.
Features
Levelled and levelled platforms of 4m x 4.5m
yellow tariff lighting
Height : 8 m
Ground level access : 2
Dockside access : 2
Floor load : 3 t/m²
Heavy traffic
Layout :
Open space
Technical :
False ceilings, Double glazing
Mezzanine offices
Other info
| Covered surface |
2,204 sqm |
| Under-beam height |
8.00 m |
| Loading bays |
2 |