Code | L65941 |
Contract | rent |
Type | Logistics / Industrial |
Energy class | In progress |
Surface | 50.768 m2 |
Speculative development currently under construction. The warehouse is located in the municipality of Dovera (CR). Thanks to its strategic location, the property is easily accessible from the TEEM A58 (Eastern Outer Bypass of Milan) at the "Paullo" exit and from the A1 motorway at the "Lodi" exit.
With a vast area of 49,560 square meters and a clear height of 12 meters, this asset will have excellent vertical storage capacity. The 52 loading bays simplify the loading and unloading of goods, making the process efficient and fast. A modern ESFR/NFPA sprinkler system will be installed. This system provides effective fire protection, while the REI 120 structure ensures a high level of fire resistance. The floor has been designed to support a load of 5 tons per square meter, allowing easy movement of heavy equipment and vehicles. The spacious yards provide ample space for all loading, unloading, and handling activities.
The asset has also obtained the prestigious LEED Gold certification.
Land surface | 120.343 m² |
Height under-beam | 12 m |
Sprinkler System | ESFR/NFPA |
Loading bays | 52 |
Cross-docking | Yes |
REI structure | 120 |
Loading floor capacity | 5 t/m² |
Forecourt depth | 35 m |
Name | Surface | |
---|---|---|
Warehouse | 48356 m2 | |
Offices | 1203 m2 | |
Mezzanines | 1209 m2 |
Airports | Milan Linate - 30 km |
Motorways | A58 TEEM - 11 km, A1 Milan-Naples - 19 km |
Milano, Via Sella Nuova 10
Milano, Via Revere 3
Milano, Via Ampère 30
Milano, Via Nizzoli 8
Milano, Via Gluck 46
Milano, Via Meli 26
Milano, Via Gulli 14
Milano, Via Conca Del Naviglio 20
Milano, Via Quinto Sole