Code | L69683 |
Contract | rent |
Type | Logistics / Industrial |
Energy class | In progress |
Surface | 57.000 m2 |
The new warehouse will be located in the municipality of Piacenza, in a strategic position just a few steps away from the main highway interconnections A1 (Milan-Naples) and A21 (Turin-Brescia). Specifically, it will be developed only 4 km from the "Piacenza Sud" highway exit.
The under-construction property, intended for logistics use, will be situated in a highly strategic location. This Grade A asset will be built with the most modern technologies and in full compliance with regulations. The interior spaces will be divided into multiple modules, allowing for maximum flexibility for tenant companies.
Land surface | 155.000 m² |
Height under-beam | 11,8 m |
Sprinkler System | ESFR/NFPA |
Loading bays | 72 |
Industrial doors | 8 |
Cross-docking | Yes |
Structural mesh | 20 x 19 m |
REI structure | 120 |
Loading floor capacity | 7 t/m² |
Forecourt depth | 30 m |
Motorways | A1 Milan-Naples - 4 km, A21 Turin-Brescia - 8 km |
Main streets | State Road 725 Southern Piacenza Ring Road - 4 km, State Road 9 - 5 km |
Milano, Via Sella Nuova 10
Milano, Via Revere 3
Milano, Via Ampère 30
Milano, Via Nizzoli 8
Milano, Via Gluck 46
Milano, Via Meli 26
Milano, Via Gulli 14
Milano, Via Conca Del Naviglio 20
Milano, Via Quinto Sole