Code | L7569 |
Contract | rent |
Minimum splitting | 10.000 m2 |
Type | Logistics / Industrial |
Energy class | In progress |
Surface | 42.667 m2 |
The new logistics park will be located in Telgate (BG), in via Geri. The property will be in a strategic position between Milan, Bergamo, Brescia, and the close Milan Bergamo airport. In addition, the asset is situated between the A4 Turin-Trieste motorway (the Grumello-Telgate tollgate is 4 km away) and the A35 BreBeMi motorway, in an area characterised by a great accessibility thanks to the motorway infrastructure around Milan.
The warehouse is currently under construction. Cross-docking and ideal for courier and logistics activities, it will be equipped with state-of-the-art systems, to reduce the environmental impact.
Land surface | 178.000 m² |
Height under-beam | 11,8 m |
Sprinkler System | Si |
Loading bays | 52 |
Industrial doors | 6 |
Cross-docking | Yes |
Structural mesh | 16,80 x 16,80 m |
REI structure | 120 |
Loading floor capacity | 7 t/m² |
Forecourt depth | 30 m |
Logistics Park | Yes |