Call us
+39 02 80 29 21Email us
logistics@dils.comFor more information fill out the form below and we’ll contact you.
The new logistics warehouses will be built in Agliana (PT), next to the SS 719 Prato-Pistoia, and they will be easily reached via the A11 "Firenze-Mare"motorway. This brand-new, Grade A logistics development will follow the most modern and eco-sustainable construction requirements. It will include two assets: - Warehouse A: a cross-docking building, with n. 44 loading bays; - Warehouse B: a stand alone building, ideal for traditional logistics activies.
| Typology | Logistics |
| Pre-certification | Yes |
| Certifications | LEED, BREEAM |
| Land surface | 50,000 sqm |
| Covered surface | 40,295 sqm |
| Under-beam height | 12.00 m |
| Sprinkler system | NFPA ESFR - NFPA |
| Loading bays | 50 |
| Industrial doors | 3 |
| REI structure | 120 |
| Loading floor capacity | 5 t/sqm |
| Name | Warehouse areas | Battery charging room | Technical room | Mezzanine | Office areas | Security room |
|---|---|---|---|---|---|---|
| WHA | 28,577 sqm | 411 sqm | 111 sqm | 2,971 sqm | 960 sqm | 18 sqm |
| WHB | 9,980 sqm | 141 sqm | 50 sqm | 1,143 sqm | 308 sqm | 18 sqm |
| Highways | A11 - 4 km Driving |