Call us
+39 02 80 29 21Email us
logistics@dils.comFor more information fill out the form below and we’ll contact you.
This logistics development, currently in its final stages and nearing completion, is located in the municipality of Vidigulfo (PV). Thanks to its strategic location, the property is easily accessible from the A7 Milan-Genoa motorway, exit "Binasco".
The development will involve the construction of two independent buildings, with the possibility of subdivision to ensure internal and external flexibility for potential tenant layouts. The first building, in the final stages of completion, includes the creation of 24 loading bays and spacious parking areas. The flooring has been designed to support a load of 5 tons per square meter, allowing for easy movement of heavy equipment and vehicles. The extensive parking areas provide ample space for all loading, unloading, and goods handling activities. This Grade A asset will be LEED Gold certified and built according to the highest construction standards.
Typology | Logistics |
Pre-certification | Yes |
Certifications | LEED Gold |
Under-beam height | 12.00 m |
Sprinkler system | ESFR/NFPA |
Loading bays | 24 |
REI structure | 120 |
Loading floor capacity | 5 t/sqm |
Name | Surface |
---|---|
Warehouse WHB | 22,095 sqm |
Mezzanine | 2,258 sqm |
Offices | 398 sqm |
Gate House e technical areas | 277 sqm |
Highways | A7 Milan-Genoa 13 km |