Code | L37164 |
Contract | rent |
Minimum splitting | 8.826 m2 |
Type | Logistics / Industrial |
Energy class | In progress |
Surface | 20.994 m2 |
The brand-new logistics warehouse is located in Vernate, in the southern area of Milan. From here in a few minutes it can be reached Binasco tollbooth with the A7 (Milan-Genoa) motorway to ensure fast and convenient connections with Linate airport and Milan Central Station, as well as Malpensa airport. The property also has strategic access to the south, towards one of the most important areas for Italian logistics.
The property has the perfect size to accommodate a tenant with a need for space and connections. A warehouse of almost 17,000 sqm with two predispositions, 2,278 sqm of mezzanines, charging battery room and large spaces for changing rooms and services, as well as 1,524 sqm of offices. There are 27 single-sided loading bays, with 12 truck parking spaces and 54 for cars. The brand-new logistics development will be carried out according to high quality standards in order to obtain the LEED GOLD certification. The offer is completed by the guardian service.
Land surface | 33.268 m² |
Covered surface | 17.916 m² |
Height under-beam | 12 m |
Sprinkler System | NFPA 13 - 2021 |
Loading bays | 27 |
Industrial doors | 2 |
Structural mesh | 18 x 18 m |
REI structure | 120 |
Loading floor capacity | 5 t/m² |
Name | Surface | |
---|---|---|
Warehouse A | 9291 m2 | |
Warehouse B | 8826 m2 | |
Mezzanine | 2585 m2 | |
Offices | 602 m2 | |
Services | 200 m2 | |
Charge room | 385 m2 |
Motorways | A7 Milan-Genoa - 2,5 km, A50 Milan West Ring Road - 9 km |
Milano, Via Sella Nuova 10
Milano, Via Revere 3
Milano, Via Ampère 30
Milano, Via Nizzoli 8
Milano, Via Gluck 46
Milano, Via Meli 26
Milano, Via Gulli 14
Milano, Via Conca Del Naviglio 20
Milano, Via Quinto Sole